Project background: Niulanjiang barrier lake regulation project is a large single project in the overall plan for post disaster recovery and reconstruction of "8.3 Ludian earthquake with m 6.5 in Yunnan" in 2014. The project includes risk elimination and flood control works, resettlement works, power station reconstruction works, etc. The project was included in 20 major construction projects under the key supervision of Yunnan provincial government in 2017, and was listed as one of the top 10 key work in 2017 by Yunnan Provincial Department of water resources.
After anti-seepage reinforcement treatment, the weir plug body is used as a water retaining structure. The minimum depth of the concrete anti-seepage wall is 130m, and the top length of the anti-seepage wall is 267m. The mountain on the right bank is successively provided with a spillway tunnel, a diversion and power generation tunnel and a flood discharge and sand flushing tunnel. The power plant is reconstructed at the site of the original Hongshiyan power station.
Solution: by the beginning of 2021, East Bluestar has supplied about 500 tons of anti impact and wear agent for the project. Compared with other concrete with the same strength grade, the concrete mixed with anti abrasion agent has the same anti abrasion and anti-corrosion performance, the viscosity and cracking risk are reduced, the workability is significantly improved, and the ability to withstand the scouring of actual water flow is significantly improved. After comprehensive treatment, Niulanjiang barrier lake will turn waste into treasure. Eliminate harm and promote benefit and benefit the people of one side.
Article label: